Containerized electrical rooms for a 10MW solar plant in Salinas – Puerto Rico

DESCRIPTION OF PROYECT

First solar park to meet the minimum technical requirements necessary for the efficient integration of Puerto Rico’s electric power grid.

Vista aérea de la Planta Solar de 10 Mw en Salinas - Puerto Rico

SCOPE

Electrical integration under UL regulations inside 5 maritime containers mechanically transformed, 3 of 20’HC and 2 of 40’HC, consisting of:


  • Location and support of electrical equipment
  • Supply and assembly of electrical conduits
  • Wiring and electrical connection of electrical equipment
  • Land network
  • Supply and assembly of Auxiliary Services table
  • Lighting
  • Power take-offs
  • Ventilation with filtration for cooling
  • FAT tests
Detalle de falso suelo técnico Detalle de conexionado eléctrico Detalle de conexionado eléctrico Detalle de conexión de tierras Detalle de filtro en rejilla de entrada de aire Detalles de alumbrado y ventilación Detalle interior de contenedor Detalle interior de contenedor Carga en camión de contenedor Vista general de contenedor ubicado en obra Vista general de los contenedores ubicados en obra Vista general de los contenedores ubicados en obra

DATA SHEET:

CLIENT:

GREENPOWER

LOCATION:

Salinas (Puerto Rico)

DATE:

2014

DURATION:

2 meses

BUDGET:

100.000 € - 500.000 €