Conveyor belts in Asturiana de Zinc (AZSA)

DESCRIPTION OF PROYECT

Electrical installation and control of the circuit of ore conveyors from port and new warehouse to factory.

Azsa

SCOPE


  • Manufacture and installation of the CGBT, as well as the motor control centers
  • Installation of pipelines and installation of power lines to receivers
  • Installation of pipelines and wiring of control devices, from control panel, to local boxes for collecting signals
  • Lighting and power for auxiliary services
  • Implementation of the system of control of start, stop and management of the movement of the whole circuit of machines of material entry to factory, in PLC, as well as implementation of the system of supervision and monitoring SCADA of the entire circuit
  • Start-up of the entire electrical installation and control system

DATA SHEET:

CLIENT:

GRUPO NAVEC

LOCATION:

San Juan de Nieva (Asturias) - España

DATE:

2014

DURATION:

6 meses

BUDGET:

> 500.000 €