Installation and automatization of conveyor belts for Onubaport

DESCRIPTION OF PROYECT

Electrical installation and industrial control of the conveyor belt system for ore concentrate at the Juan Gonzalo Engineer dock.

Onubaport

SCOPE


  • Design, manufacture and assembly of motor control centers
  • Supply, laying and connection of the power cable from the motors to the CCM and from the control cable from the field elements to the CCM
  • Supply and placement of the pipeline
  • Installation of Lighting and Auxiliary Services
  • Development, implementation and integration of the control system for the whole installation. As well as the supervision and monitoring system, SCADA
  • Start-up of the entire electrical installation and control

DATA SHEET:

CLIENT:

GRUPO NAVEC

LOCATION:

Muelle Ingeniero Juan Gonzalo - Palos de la Frontera – Huelva - España

DATE:

2015 (En ejecución)

DURATION:

6 meses

BUDGET:

> 1.000.000 €