Electrical installation and automation for curved conveyor belt of ore in Reocín (AZSA mine)

DESCRIPTION OF PROYECT

Transport of ore by conveyor belt

Reocín

SCOPE


  • Electrical installation of curved conveyor belt for transporting ore in outdoor mining
  • Curved conveyor belt control for ore transport in outdoor mining

DATA SHEET:

CLIENT:

MSI

LOCATION:

Torrelavega - Cantabria - España

DATE:

1995

DURATION:

2 meses

BUDGET:

100.000 – 500.000 €