Electrical rooms for solar plant of 43.38 MW in Marcovia – Honduras

DESCRIPTION OF PROYECT

First solar park in meeting the minimum technical requirements necessary for the efficient integration to the electric power network of Honduras.

Vista aérea de la Planta Solar de 43,38MW en Marcovia - Honduras

SCOPE

Electrical-mechanical integration of 25 maritime containers, 2 of 20’HC and 23 of 40’HC, consisting of:


  • Engineering (structural calculations and manufacturing drawings)
  • Opening of gaps
  • Assembly of reinforcements and frames
  • Thermal isolation
  • Interior and exterior painting (C4-M)
  • Benches of electrical equipment
  • Technical floor
  • Ventilation accessories (hoods, air intake grilles, air filters, ...)
  • Access doors
  • FAT tests
  • Location and support of electrical equipment
  • Supply and assembly of electrical conduits
  • Wiring and electrical connection of electrical equipment
  • Land network
  • Supply and assembly of Auxiliary Services table
  • Lighting
  • Power take-offs
  • Ventilation
  • FAT tests
  • Start-up in plant
  • Fire detection
Acopio de los contendores para el proyecto Detalle de perfilería de hierro Detalle de panel de aislamiento Detalle de montaje de canalización eléctrica en suelo técnico Ubicación de equipos eléctricos sobre bancada Detalle de conexión en cuadro de Baja Tensión Detalle de conexión eléctrica de potencia Detalle interior de sala de Media Tensión Detalle de red de tierras Detalle de canalizaciones eléctricas Detalle de ventilación interior Detalle de ventilación exterior Contenedor de 40´ ubicado en planta Contenedor de 40´ junto a paneles solares

DATA SHEET:

CLIENT:

GREENPOWER

LOCATION:

Marcovia (Honduras)

DATE:

2015

DURATION:

3 meses

BUDGET:

500.000 - 1.000.000 €